Hello, Welcome to ECCT Construnction website
Free Consultation
Facebook
Twitter
Instagram
Linkedin
Youtube
TikTOK
Building128, El Narges 1
New Cairo, Egypt.
info@ecct-eg.com
+20106 8807767
Home
projects
Infrastructure Projects
Buildings Projects
Landscape Projects
Certificates
News
About us
Contact us
Home
projects
Infrastructure Projects
Buildings Projects
Landscape Projects
Certificates
News
About us
Contact us
Facebook
Twitter
Instagram
Linkedin
Youtube
TikTOK
© Copyright 2026
Home
Projects
Infrastructure Projects
Construction of Export Terminal – TCI Part of Abu Dhabi Group at Badr Dry Port.
Ports & Marines Infrastructure
Marine Excavation Works & Pedestrian Bridge “MARASSI”, North Coast, Egypt
Ports & Marines Infrastructure
RO plants supply & Reject lines, EFC El Sokhna.
Ports & Marines Infrastructure
Extension Container Terminal Area A – Basin 1, Sokhna Port, Egypt
Ports & Marines Infrastructure
Sea Water Intake Pit – Basin 3 Liquid Bulk Terminal, Sokhna Port
Ports & Marines Infrastructure
New Truck Parking Area at Main Gate 1, Sokhna Port, Egypt
Ports & Marines Infrastructure
Basin 2 of DP World, Sokhna Port (Excavation by Dewatering), Sokhna Port
Ports & Marines Infrastructure
Bridge (Abutment and Bents) and Loading Platform, Sokhna Port
Ports & Marines Infrastructure
15 Hectare Extension Liquid Terminal Sokhna – Basin 3, Sokhna Port, Egypt
Ports & Marines Infrastructure
Pavement Extension Area (B) – Basin 1, Sokhna Port, Egypt
Ports & Marines Infrastructure
The Infrastructure Project, Sugar Refinery, Sokhna Port
Ports & Marines Infrastructure
Truck Parking Area and Car Shed of Head Office, Sokhna Port, Egypt
Ports & Marines Infrastructure
Metal Safety Fence, Al-Ain El-Sokhna, Egypt
Ports & Marines Infrastructure
Paving Works Project for Slaughter House – Sokhna Livestock, Sokhna Port, Egypt
Ports & Marines Infrastructure
Paved Area West Workshop – Basin 1, Sokhna Port, Egypt
Ports & Marines Infrastructure
Tank Farm – Basin 3 Liquid Terminal Sokhna port, Sokhna Port
Ports & Marines Infrastructure
ECCT
_
Ports & Marines Infrastructure
Construction of Export Terminal – TCI Part of Abu Dhabi Group at Badr Dry Port.
RO4.1 & RO4.2 Feed Lines And Reject Lines & Product Lines (Egyptian Fertilizer Company)
Marine Excavation Works & Pedestrian Bridge "MARASSI”, North Coast, Egypt
Extension Container Terminal Area A – Basin 1, DP World Sokhna Port, Egypt
Sea Water Intake Pit – Basin 3 Liquid Bulk Terminal, Sokhna Port
TCL - 2025
EFC - 2025
New Truck Parking Area at Main Gate 1, DP World Sokhna Port, Egypt
Basin 2 of DP World , Sokhna Port (Excavation by Dewatering)
Bridge (Abutment and Bents) and Loading Platform – Basin 3 Liquid dry Bulk Terminal, Sokhna Port (PMS)
15 Hectare Extension Liquid Terminal Sokhna - Basin 3, Sokhna Port, Egypt
Pavement Extension Area (B) – Basin 1, Sokhna Port( DP World) , Egypt
The Infrastructure Project, Sugar Refinery, Sokhna Port
Metal Safety Fence, Al-Ain El-Sokhna
Paving Works Project for Slaughter House – Sokhna Livestock, Sokhna Port
Paved Area West Workshop – Basin 1, Sokhna Port
Tank Farm – Basin 3 Liquid Terminal Sokhna port, Sokhna Port
Truck Parking Area & Car Shed of Head Office, Sokhna Port
←
Contact Us
Contact Form
WhatsApp