Hello, Welcome to ECCT Construnction website
Free Consultation
Facebook
Twitter
Instagram
Linkedin
Youtube
TikTOK
Building128, El Narges 1
New Cairo, Egypt.
info@ecct-eg.com
+20106 8807767
Home
projects
Infrastructure Projects
Buildings Projects
Landscape Projects
Certificates
News
About us
Contact us
Home
projects
Infrastructure Projects
Buildings Projects
Landscape Projects
Certificates
News
About us
Contact us
Facebook
Twitter
Instagram
Linkedin
Youtube
TikTOK
© Copyright 2026
Home
Projects
Ports & Marines Infrastructure
_
Extension Container Terminal Area A - Basin 1, Sokhna Port, Egypt
_
Project Information:
Type:
Ports & Marines Infrastructure
Architect:
ATMS
Owner:
DP World Sokhna
Contract Value:
51 Millions EGP
Manager:
ATMS
Status:
Running (2021)
ECCT
_
Project Description:
Demolishing works for about 3,000 m3 of concrete & many UG utilities.
Excavation & transport to dump area of 116,000 m3.
Soil replacement of well graded base coarse of 110,000 m3 in layers.
Concrete paver blocks 500 kg/cm2 total area 82,000 M2, complete with roads & slot marking.
Duct banks made of multi PVC pipe inside concrete envelope total 1790 ML.
Electric cables for MV, LV & fiber optic cable, total 7,110 ML complete with RC manholes.
Four high mast 45 ML complete with foundation & lighting fixture.
Four containerized sub stations complete with 1 MVA transformers by ABB, switchgear, panels by Schnieder.
SCADA system by Siemens for monitoring substations’ switchgears & lighting control.
Firefighting pipe line HDPE 315 mm 640 ML complete with hydrants & manhole.
RC Slot Drain on a 300 mm PVC pipes, drainage pipe line 400-500 mm PVC pipe & 750 mm concrete pipe total 1,265 ML.
Construction of sanitary & substation RC buildings complete with all finishes and RC leakage pit 7.4 m x 20.7 m
←