ECCT
_

Ports & Marines Infrastructure

  • Construction of Export Terminal – TCI Part of Abu Dhabi Group at Badr Dry Port.
  • RO4.1 & RO4.2 Feed Lines And Reject Lines & Product Lines (Egyptian Fertilizer Company)
  • Marine Excavation Works & Pedestrian Bridge "MARASSI”, North Coast, Egypt
  • Extension Container Terminal Area A – Basin 1, DP World Sokhna Port, Egypt
  • Sea Water Intake Pit – Basin 3 Liquid Bulk Terminal, Sokhna Port
  • TCL - 2025
  • EFC - 2025
  • New Truck Parking Area at Main Gate 1, DP World Sokhna Port, Egypt
  • Basin 2 of DP World , Sokhna Port (Excavation by Dewatering)
  • Bridge (Abutment and Bents) and Loading Platform – Basin 3 Liquid dry Bulk Terminal, Sokhna Port (PMS)
  • 15 Hectare Extension Liquid Terminal Sokhna - Basin 3, Sokhna Port, Egypt
  • Pavement Extension Area (B) – Basin 1, Sokhna Port( DP World) , Egypt
  • The Infrastructure Project, Sugar Refinery, Sokhna Port
  • Metal Safety Fence, Al-Ain El-Sokhna
  • Paving Works Project for Slaughter House – Sokhna Livestock, Sokhna Port
  • Paved Area West Workshop – Basin 1, Sokhna Port
  • Tank Farm – Basin 3 Liquid Terminal Sokhna port, Sokhna Port
  • Truck Parking Area & Car Shed of Head Office, Sokhna Port